• Located in Ain Sokhna – Suez – the administration building of the company was built to hold 3 story on a total built-up area of 1500 sq m. Constructed using horizontal separated concrete base, the building was executed using high standard and quality material such as granite, ceramics, aluminum, plastic paint and glass, as well as all the required infrastructure.

  • Category: CRC - Egypt - Factories
  • Date: 15 Jan 2020